[Smart Helmet Case Study] Efficiency Improvement in Large-Scale Construction with Over 1,000 Workers
By simply attaching a lightweight tag to existing helmets, the burden on the site is significantly reduced! With high-precision tracking at five times per second, immediate response is possible. Battery life of up to 2.5 years. *Case study introduction.
We would like to introduce a case study where the smart helmet "LinkForce," which we handle, was implemented to achieve efficiency and safety improvements. In a work environment where over 1,000 workers and more than 70 partner companies operate simultaneously, there were challenges such as a complex collaborative structure and unclear responsibilities. After implementation, labor safety and work efficiency dramatically improved through real-time tracking and operational analysis. 【Case Overview】 ■ Project Scale - Two 52-story high-rise residential buildings - Total floor area: approximately 100,000 m² ■ Site Environment - TOD (Transit-Oriented Development) project - Strict regulatory environment with frequent safety inspections - Over 1,000 workers and more than 70 partner companies operating simultaneously *For more details, please download the PDF or feel free to contact us.
- Company:MytePro Technology Japan
- Price:Other